![]() |
外型尺寸 | HCMM60-MM120 |
货号 | 001 |
品牌 | 兴淼 |
用途 | 拦水 景观 |
型号 | 齐全可定制 |
无锡液压升降坝操作步骤
液压升降坝优点英文版:
1. The lifting dam has different basic specifications, mutual functions, simple structure, simple production and processing, and high operation safety performance
液压升降坝优点:
1、升降坝基本规格不同,功效相互间、构造简易,生产加工简易,运作安全性能高。
2、建筑施工简易、工程预算合理,升降坝,投资项目仅为橡胶坝的1/2左右。
3、自动式起闭,机械自动化水位精准,运行时可信性优质。管理方案方便快捷安全系数、省人、便捷、节省成本、省力。
4、门页为混凝土构件钢筋混凝土结构,仅支撑柱一部分为金属结构。维修方便快捷,花销低。
5、由于能精准自动式监管水位、就现如今水资源短缺,在合理运用和应用水资源有其独到之处。
无锡液压升降坝操作步骤
液压升降坝采用结构:
一、采用一行油压缸直顶以底端为轴的活动主题拦水坝面的后背,保持升坝拦水,降坝排洪的目地。
二、采用一行拖动支撑架支点活动主题坝坡的反面(注:工程项目相片上采用的是H形活动主题双杠支点,之后工程项目都采用拖动单杆支点更坚固),组成平稳的支点墩坝。
三、采用连动钢铰线推动定位销,导致支点墩坝固定不动不会改变不会改变和活动主题的相互交换,超过固定不动不会改变不会改变拦水,活动主题降坝的目地。
Dam lowering structure:
Using a line of hydraulic cylinder top to the bottom of the shaft of the activity theme on the surface of the dam back, keep/dam water, drop dam line 2, using a drag brace protection activity theme the reverse of the dam slope (note: the project of using in the photo is H form a point, after the project is using drag single lever fulcrum more solid) and smooth of the fulcrum of pier dam.
Three, the use of continuous steel hinge line to push the positioning pin, resulting in the fulcrum pier dam fixed fixed will not change will not change and the theme of the event more than fixed fixed will not change the attack will not change the water, the theme of the event to drop the dam.
Iv. Adopt the buoy power switch, operate the hydraulic transmission system of the operation process, exceed the management system of no one, and maintain the automatic electric lifting platform of the dam slope with the theme of activities according to the flood and flood platform
A new browser, Microsoft Edge, does more
The default Settings of yougov
No more inquiries for AAi0
液压升降坝具有哪些优点?
1.因为新型液压坝不像传统的河堤或者拦河坝,它在建坝时无需运用许多的金属复合材料零配件,只需在坝坡现浇混凝土金钢混凝土。能够挺大水准上节约资金管理
The detailed design plan has credibility and can be incorporated into various water conservancy and hydropower projects and geological specifications. Dam slope thickness small damage other infrastructure projects in addition to withstand the flood disaster. The design of the scheme is reasonable and can distribute the upper, middle and lower pressure.
3. The operation process management scheme is very convenient and fast, only be sure to repair and maintain the hydraulic dam on time, which is convenient to manage at ordinary times.
4. Solid structure, diligent in rescue and relief work. The ability to withstand heavy rains and use them for a long period of time also has a direct cost at a certain level. 5. Because of its unique shape and design, it can be used for scenic spots with the theme of landscape and garden activities, and can improve the natural environment and promote urban development.
Element ae boty p span = pan dly
Width
Already ball into 209 according to return goods A17 remarks: product war Ming maximum $80,000 words
Aowuite, the heavy he mn car and a*
Bao rEnsnn
The goods in advance
Escape to the new aaa Mieroaot Edge to perform e-economy operations
Change my default Settings
Hs
No longer ask
RA004 between Japan and China